George Kristoff Water Treatment Plant
West Sacramento, CA

Client: Carollo Engineers

  • Services Provided:
  • LiDAR Acquisition
  • Leica TruView files
  • 3D Model

R.E.Y. Engineers assisted the City of West Sacramento in the re-design of the existing chlorine room at George Kristoff Water Treatment Plant (GKWTP). R.E.Y. provided LiDAR acquisition, 360° imagery, as-builts of the interior walls, ceiling and floor, a registered point cloud of six scan worlds, Leica TruView files and a 3D model of the room. The data was used to aid in the design of a chlorine to sodium hypochlorite conversion.

More Surveying ProjectsAll Projects