First Street Pavement Resurfacing
Lincoln, CA

Project Name: First Street Resurfacing and Pedestrian Improvements
Location: Lincoln, CA
Client: City of Lincoln

Services Provided:

• Project Management
• Site Investigations
• Data Collection
• Records Research
• Preliminary Design
• Funding/Phasing Plan
• Environmental Studies
• Environmental Permitting
• Geotechnical Report
• Hydrology & Hydraulics Study
• Final Design (PS&E)
• Utility Relocation Coordination
• Caltrans Coordination & Approval
• Bid Support
• Construction Engineering Support
• As-Built Drawings

R.E.Y. provided a full range of project management and civil design services for this project to improve First Street between K Street and O Street. The project reconstructed the existing roadway, segments of curb and gutter and bicycle facilities utilizing Regional Surface Transportation Program (RSTP) funding for construction. The majority of the existing asphalt pavement was in disrepair with flat gutter slopes and settlement, cracked gutter pans and a limited number of catch basins. R.E.Y. implemented a combination of underground and surface drainage improvements to maximize the lifespan of the final paving product. Improvements also included new curb ramps and pedestrian facilities for compliance with ADA Standards and enhanced pedestrian safety and usability.

More Engineering ProjectsAll Projects